Skip to content

Hotel compliance, classification and design in West Africa

We get your property ready for the official inspection: a criterion-by-criterion gap report against your country’s grid, a programme of compliance works, and support right up to the visit.

We never award a classification: only each country’s authority can do that.

Gap report, extract

Fictitious example

  • Emergency exits signposted and lit

    Priority 1

    Safety, criterion 7.4

    No exit signage on the 2nd floor, photo 14

  • Guest register kept up to date

    Compliant

    Administration, criterion 6.2

    Compliant, current year’s register

  • Room floor area

    Priority 2

    Rooms, criterion 4.1

    Room 12 is below the floor area required for the target category

  • Fire extinguishers in place and serviced

    Priority 2

    Safety, criterion 7.1

    In place; last service not dated

Every gap points to the applicable rule, the photo and the finding confirmed on site.

An architect’s and an inspector’s eye, before the official visit

More than ten years spent bringing a hundred or so hotels in France up to standard: new builds, refurbishments, fire safety, accessibility. Now based in Lomé, we apply the same method to the classification grids of Togo, Côte d’Ivoire, Senegal, Benin and ECOWAS.

The regulations are written in French. We explain them in plain English, so that owners, investors and lenders can read the same file, and you are welcome to write to us in English.

About Emiliano, the founder

Criterion by criterion
Every finding is tied to the grid criterion, to the rule it rests on and to the photo taken on site.
A calculation anyone can re-run
A rules engine applies the country’s grid, and the full calculation trail appears in the report. No hidden judgement calls.
A works programme
Gaps are ranked by priority and grouped into work packages, ready to be costed and scheduled.

Pre-assessment

You want to know where the property stands before committing to works or to an application.

On site
Half a day
You receive
A 10 to 15-page gap report, with priorities
Indicative price
XOF 500,000–900,000 (about €760–1,370)
Pre-assessment in detail

Full audit

You are preparing a classification application or a move up a category.

On site
One to two days
You receive
A criterion-by-criterion report and a compliance programme costed by work package
Indicative price
XOF 2–4 million depending on size (about €3,050–6,100)
Full audit in detail

New-build review

Your drawings are not yet final and you know the category you are aiming for.

On site
Review of the brief and the drawings
You receive
A consistency note and a list of non-compliances before submission
Indicative price
1–1.5% of construction cost
New-build review in detail

Indicative prices in CFA francs (XOF), confirmed by a quotation after a first conversation. Euro equivalents at the fixed rate of XOF 655.957 to the euro.

From your first message to the report

  1. You describe the property

    Country, number of rooms, target category. Emiliano replies within 48 hours.

  2. A conversation, then a quotation

    We agree on the engagement that fits; the indicative price is confirmed by a quotation.

  3. The site visit

    Half a day to two days: every criterion of the grid is checked room by room, with photos and measurements.

  4. The signed report

    Every gap is tied to its criterion, its rule and its evidence, with a works programme ranked by priority.

Where your country’s regulations stand

Legislation, authorities and grids differ from one country to the next, and almost all of it is published in French only. Each page sets out the framework, the procedure and what still needs confirming, in English, with dated sources.

  • Togo

    Criteria : Not published

    Legal basis and authority
    Legal basis
    Decree 89-137/PR of 23 August 1989
    Authority
    CNACET, the national tourism licensing and classification commission
  • Côte d’Ivoire

    Criteria : Standard sold by CODINORM: 175 criteria in 9 sections, 520 points

    Legal basis and authority
    Legal basis
    Tourism Code (2014); NI 6500 standard mandatory since 2022
    Authority
    National Classification Commission; CODINORM, the national standards body
  • Senegal

    Criteria : Implementing orders not found online

    Legal basis and authority
    Legal basis
    Decree 2005-145 of 2 March 2005
    Authority
    National Licensing and Classification Commission
  • Benin

    Criteria : Not published

    Legal basis and authority
    Legal basis
    Decree 2023-494 of 26 September 2023
    Authority
    To be confirmed
  • ECOWAS

    Criteria : Standards for each accommodation type being validated

    Legal basis and authority
    Legal basis
    Eight texts adopted by tourism ministers in Lomé on 7 April 2023
    Authority
    A national classification commission required in every member state

Our founder sits on Togo’s classification commission. Here is how we keep the two roles apart.

Systematic recusal, separate files, and no property taken on as a client if the commission has examined it in the past two years: seven public commitments, checked every year by an independent third party.

Read the seven commitments

Tell us about your property

Describe the hotel, its number of rooms and the category you are aiming for. Emiliano replies within 48 hours, with no automated follow-up.